Hunt Wesson
Davis, CA

Hunt Wesson Switch Panel

Project Highlights:
  • Control system coordination and terminations
  • Steel erection
  • Concrete forms and pouring of all pads and piers
  • Primary and secondary pole lines
  • High voltage splicing
  • Secondary line repairs
Contractor: PEI Placer Electric Incorporated

PEI was the prime contractor for the installation of Hunt Wesson's new 115 KV, 10MV substation in Davis, California. PEI was involved with Hunt Wesson's engineering personnel and PG&E in the design and equipment selection process.

PEI provided civil engineering drawings and calculations for all concrete pads and piers. PEI also installed a 115KV pole line to intercept PG&E's existing transmission line, saving Hunt Wesson $100,000 on the overall project.

Hunt Wesson Substation
  Placer Electric Incorporated