Project Highlights:
- Control system coordination and terminations
- Steel erection
- Concrete forms and pouring of all pads and piers
- Primary and secondary pole lines
- High voltage splicing
- Secondary line repairs
Contractor: PEI Placer Electric Incorporated |
PEI was the prime contractor
for the installation of Hunt Wesson's new 115 KV, 10MV substation in Davis,
California. PEI was involved with Hunt Wesson's engineering personnel and
PG&E in the design and equipment selection process. PEI provided
civil engineering drawings and calculations for all concrete pads and piers.
PEI also installed a 115KV pole line to intercept PG&E's existing
transmission line, saving Hunt Wesson $100,000 on the overall project.
 |